MCED BEF-300 industrial glycol chiller
MCED · Industrial Series · BEF-300 / 500 / 800 / 1000 · QUOTE

MCED Industrial Glycol Chiller

Industrial glycol chillers for production cellars: the 3.25 HP BEF-300 (28,500 BTU/hr) and 5 HP BEF-500 (46,000 BTU/hr), or two units on one BFT-67 as the BEF-800 and BEF-1000. Hardwired 220V single phase. Priced per build.

Est. 2014
✓
⚡ 220V single-phase hardwired install — both models are NOT plug-in. They wire directly to a 50A (BEF-300) or 70A (BEF-500) circuit with an external disconnect. A licensed electrician is required for hookup. Most commercial cellars already have this infrastructure or budget for it as part of buildout.

MCED's industrial glycol chillers for production cellars. The BEF-300 (3.25 HP, 28,500 BTU/hr) and BEF-500 (5 HP, 46,000 BTU/hr) run straight line or on the BFT-67 67-gallon reservoir. Two units on one BFT-67 make the BEF-800 (a BEF-300 + BEF-500) or the BEF-1000 (two BEF-500s). Outdoor versions of the BEF-300 and BEF-500 are also available.

Hardwired 220V single phase, connected by an electrician. Priced per build: tell us your fermenters and cellar, and we size it and quote it.

Step 1 — Choose your size BEF-300
Priced per build Model, indoor or outdoor unit, reservoir, pump count and freight change the price. Tell us your setup and we reply within one business day.
→
Ready to ship · most orders out in under a week
1y
1-year warranty · service and parts direct from MCED
✉
Talk to a brewer, not a sales rep · email or call — real humans
Step 2 — Reservoir configuration

Straight line, or on the BFT-67.

These units run either straight line, without a reservoir, or sitting on MCED's BFT-67 67-gal reservoir, which takes up to 10 pumps. The BEF-800 and BEF-1000 are two units on one BFT-67. Decide here; it goes into your quote.

Setup and manuals

See how it sets up before you buy.

Our glycol manual covers setup, the glycol mix, connecting your fermenters and cold crashing.

How to use a glycol chillerSetup, controller settings and holding a steady fermentation temperature.
Glycol chiller + Unitank setupConnecting the glycol lines and the temperature control kit, step by step.

All our videos and manuals are on the Learn page →

What industrial install looks like

Industrial installs need a real electrician and brewery contractor.

The Industrial Series is engineered for breweries that already have a commercial cellar — concrete floor, 220V single-phase service available, drain in the floor for glycol flush. We don't install — but we'll send your electrician the schematic and your brewery contractor the plumbing diagram, and walk both through it on a call before the unit ships.

  • Licensed electrician — 50A circuit + disconnect for BEF-300, 70A for BEF-500 (we send the schematic before the unit ships)
  • Brewery contractor — glycol manifold + insulated trunk to fermenters (we send the plumbing diagram and walk through it on a call)
  • ~half a day on-site — typical install if the 220V circuit is already there; full day if a new circuit needs to be pulled
  • Lead time 4–8 weeks made-to-order — LTL palletized + white-glove curbside drop
Sizing & compatibility

What the Industrial Series will cool.

Run them straight line or on the BFT-67 67-gallon reservoir. Two units on one BFT-67 make the BEF-800 or BEF-1000. Outdoor versions of the BEF-300 and BEF-500 are also available and pair the same way.

BEF-300

20 BBL hall

6–12 BBL fermenters

Comfortably runs a 20 BBL production hall with 6–12 fermenters under typical brewery duty (ales + occasional lagers). 3.25 HP compressor, 28,500 BTU. Pair with BFT-67 + 6 pumps for the standard install.

3.25 HP · 50A
BEF-500

40 BBL hall

10–20 BBL fermenters

For 40 BBL halls running 10–20 fermenters, or smaller halls with regular lager pull-downs. 5 HP compressor, 46,000 BTU/hr. Pair with a BFT-67 and up to 10 pumps; add a second unit on the same BFT-67 to make a BEF-1000.

5.0 HP · 70A
Paired units

BEF-800 · BEF-1000

2 units on one BFT-67

BEF-800: a BEF-300 and a BEF-500 on one BFT-67, about 74,500 BTU/hr combined. BEF-1000: two BEF-500s, about 92,000 BTU/hr. Two units also keep you cooling if one is down for service.

See BFT-67 →
Technical specifications

Specs by model.

Specs for:
Cooling capacity

28,500 BTU/hr · evap 25°F, ambient 90°F

Compressor

3.25 HP hermetic

Refrigerant

R448

Voltage

220V · 60Hz · single phase

Electrical install

Hardwired — wired by an electrician with an external disconnect (no plug)

Min circuit ampacity

31.8A · max fuse 50A · compressor RLA 23.2A

Controller

Chiller Watch built in · cloud-connected

Dimensions

35" W × 25" D × 20" H (chiller alone) · 45" H (with reservoir) · 242 lb dry

Reservoir compatibility

Pairs with BFT-67 (67 gal) for centralized cooling · supports 2 chiller decks per BFT-67

Base price

Quote-based PRE-QUOTE · request a quote for chiller + reservoir + freight

CA
Canadian company · CAD pricingShips Canada-wide from Vancouver, BC
1y
1-year warranty · MCED serviceRepairs handled by the manufacturer
CA
Made by MCED in MontrealCanadian-built glycol chillers
✉
Talk to a brewer, not a sales repReal humans · email or call
Common questions

About the Industrial Series.

Why is pricing quote-based instead of listed?+

Three reasons. (1) Industrial chillers ship LTL with significant freight + brokerage variation by region — quoting at checkout would either overcharge half our buyers or undercharge the other half. (2) Most cellars buy the chiller alongside the BFT-67 reservoir, a custom plumbing manifold, and a recommended electrician spec — packaging that as one quote is the right shape. (3) Production-tier and below are commodity SKUs; Industrial-tier is a project we want to walk through with you. Submit the form and we'll come back within 48 hours.

BEF-300, BEF-500, BEF-800 or BEF-1000?+

By peak load. BEF-300: 28,500 BTU/hr, around a 20 BBL hall running mostly ales. BEF-500: 46,000 BTU/hr, around a 40 BBL hall, or smaller halls running back-to-back lager crashes. BEF-800 (BEF-300 + BEF-500) and BEF-1000 (two BEF-500s) run on one BFT-67 for bigger loads or a built-in backup. Send us your fermenter list and we size it in the quote.

Do I need the BFT-67 reservoir?+

No. These units also run straight line, without a reservoir. Most production halls add the BFT-67 (67 gal) because (1) more thermal mass means a steadier supply temperature under variable demand, (2) it takes up to 10 pumps, one per fermenter, and (3) it takes a second unit, which is how the BEF-800 and BEF-1000 are built.

What does the electrician actually need to do?+

Run a 220V single-phase circuit to the chiller location — 50A breaker + disconnect for BEF-300, 70A for BEF-500. Wire the chiller's terminal block to that disconnect (no plug, no whip). We send the schematic to your electrician before the unit ships. Typical half-day install if the panel + circuit is already there; full day if a new circuit needs to be pulled. Your brewery contractor handles the glycol manifold + insulated trunk separately.

Can I add a second chiller deck later?+

Yes. The BFT-67 takes two chiller units. Start with one BEF-300 or BEF-500 on a BFT-67, then add a second unit later to make a BEF-800 or BEF-1000 when you grow.

Why isn't glycol included?+

Industrial-scale glycol fills are typically 30–50 gal of pre-mixed propylene — that's a hazmat freight class on its own. Easier and cheaper for you to buy bulk from a regional HVAC supplier. Food-safe propylene only (never ethylene). Mix to ~30% propylene of total system volume — that's the reservoir (built-in or 67 gal) plus all your fermenter jackets and the connecting glycol trunk. We send a fluid-volume calculation as part of the quote.

Shipping & lead time?+

4–8 weeks from order — Industrial chillers are made-to-order with the reservoir + pump count + voltage spec configured per quote. Sh

Warranty & service?+

1-year warranty on the refrigeration loop, direct through MCED Systems. Our role is fulfillment, install support and tech triage; warranty repairs go through MCED.

Still have questions? Talk to a brewer, not a sales rep. Email or call us during business hours (Pacific time).

20–40 BBL hall.
Quote-based. White-glove install.

MCED Industrial Series — commercial chillers for production breweries. Made-to-order in 4–8 weeks. Manufactured in Canada by MCED. 1-year warranty, priority service.